Full bathroom renovations, tiled and waterproofed as one job
Bathroom Renovation

A bathroom renovation lives or dies on what happens under the tile — the fall to the drain, the waterproofing membrane, the flatness of the substrate. Davide sets each one out by hand before a single tile goes down, so the finished room reads as one continuous surface rather than a patchwork of trades.
Every renovation is run as a single job: demolition, waterproofing, tiling, and the fit-off of vanities, floor wastes and niches, coordinated so the bathroom moves from strip-out to finished room without long gaps between trades.
What’s included
- Full strip-out and preparation of the existing bathroom
- Compliant waterproofing to floors, walls and shower recesses
- Porcelain, marble, mosaic and large-format tiling
- Floating and freestanding vanities, niches and feature walls
- Screed falls set out for correct drainage to the waste
Recent work
Bathroom Renovation across the Eastern Suburbs.
Frequently asked
- The whole job — demolition, waterproofing, tiling and the fit-off of vanities, floor wastes and screens. One tiler carries the room from strip-out to finish, so there is no handover between separate trades for the wet area work.
- A standard bathroom generally runs 2–4 weeks depending on waterproofing cure times, tile format and any structural work uncovered during strip-out. You will get a clear timeframe once the scope is confirmed on site.
- Yes. Supply-only tiling is available if you already have your tiles, and Davide can also help source porcelain, marble or large-format options if you are still deciding.
Do you handle the whole bathroom renovation, or just the tiling?
How long does a typical bathroom renovation take?
Can you match an existing tile or work with tiles I have already bought?
Also offered
Ready to talk about bathroom renovations?
Call or email Davide directly — no forms, no call centre. Tell him what you're planning and he'll give you a straight answer.

